87% of Ukraine's coal reserve sits at five DTEK plants, and supply rests on a single producer: DTEK Pavlohradvuhillia.
Since the beginning of September, DTEK's TPPs have burned 921 thousand tonnes of coal but received only 591 thousand tonnes. At 4 GW the consumption rises to some 33 kt/day, which is equal to 37 days of consumption without supply.
The constraint is not the mine, it is the route from mine to plant. Pavlohradvuhillia operates 2 to 12 km from the front line, within reach of even short-range FPV drones. Between 17 and 31 August strikes hit the coal preparation plant, the railcar loading point, the rail depot and locomotives, with the same damaged units targeted repeatedly. 8 of the 17 locomotives that move coal onto the Ukrzaliznytsia network have been destroyed or severely damaged, and replacements are hard to find amid a nationwide shortage of rolling stock: around 300 Ukrzaliznytsia locomotives have been lost since attacks on rolling stock began. Two mines, Stepova and Yuvileina, were briefly forced to suspend operations, and coal shipments from the Dniprovska mine were temporarily halted after its surface production facilities were damaged. To reduce the risk of further strikes, the enterprises temporarily switched to operating mainly at night.
If the attacks continue and these facilities are not provided with military air defence cover, coal stocks at TPPs will be depleted by the end of January 2027. Protection against jet-powered UAVs is currently possible only with MANPADS, which are not available. Sustaining operations requires humanitarian assistance in the form of new locomotives and spare parts.